Sprint or milestone retrospective from completed work, velocity, blockers. Actionable insights for the next iteration.
复制下面这句话,粘贴给 Claude Code、Codex、Cursor 等 AI 编程工具,它会读取安装说明并在你确认后完成安装。
请阅读 https://ai.atlankj.com/install/asset/gh-retrospective-dca0d2932835 ,按照其中的说明把「retrospective」安装到你(当前 AI 工具)中。执行前先告诉我将运行的命令和写入的位置,等我确认。
查看 AI 将读取的安装说明正在读取 GitHub 原文…
内容来自 GitHub 原始文件,由原作者维护。在 GitHub 查看
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys automation
Every AskUserQuestion call follows .claude/docs/automation-modes.md
(collaborative asks always · guided major-only · autonomous logs and proceeds;
automation_always_ask categories always prompt).
If the inputs this skill needs do not exist, the answer is "could not run" — not a filled-in report. Check first, and stop if the check fails.
FOUND or ABSENT — not "assumed present".NOT ASSESSED — NO DATA. Do not estimate it, do not infer it from an
adjacent artifact, and do not leave a mandated cell to be filled by whoever
reads the template next.NOT ASSESSED — NO DATA as the whole verdict, naming what was missing and
which skill produces it.A verdict of NOT ASSESSED is a success. It is the correct, useful answer to
"what does the data say?" when there is no data. The failure mode this prevents is
specific and has been observed in practice: report templates whose verdict
enum had no "could not run" state produced false clean passes — an asset audit
returning COMPLIANT on a project with no assets and no standards, and a
performance profile reporting ">99% headroom against a 16.67ms budget" with zero
profiler data and no budget ever set.
Absence of evidence is never evidence of absence. A scan that finds no matches because there are no files to scan has not verified anything. Say which of the two happened — a reader cannot tell from a green result.
Determine whether this is a sprint retrospective (sprint-N) or a milestone retrospective (milestone-name).
Before loading any data, glob for an existing retrospective file:
production/retrospectives/retro-[sprint-slug]-*.md
(also check production/sprints/sprint-[N]-retrospective.md as an alternate location)production/retrospectives/retro-[milestone-name]-*.mdIf a matching file is found, use AskUserQuestion:
[A] Update existing — load it and add/revise sections with new data[B] Start fresh — generate a new retrospective (archive the old one)If [A]: read the existing file and carry its content forward, revising sections with new data.
If [B]: continue to Phase 2 with a blank slate. Before writing the new file, rename the existing one with a -archived-[date] suffix.
Read the sprint or milestone plan from the appropriate location:
production/sprints/production/milestones/Also check for production/sprint-status.yaml: if it exists, read it alongside the sprint plan. It is the authoritative source for actual story completion status (status: done, completed dates, blockers). Use it as the primary source for completion metrics in Phase 3. Fall back to markdown scanning only if the yaml does not exist. Note discrepancies between the yaml and the sprint plan (e.g., stories in yaml not in plan, or vice versa).
If the file does not exist or is empty, output:
"No sprint data found for [sprint/milestone]. Run
/sprint-statusto generate sprint data first, or provide the sprint details manually."
Then use AskUserQuestion to present two options:
If the user chooses [A], collect the data and continue to Phase 3 using what they provide. If the user chooses [B], stop here.
Extract: planned tasks, estimated effort, owners, and goals.
Run git log for the sprint period to understand what was actually committed and when. Use the Bash tool (which uses Git Bash on Windows — the 2>/dev/null is bash syntax, not PowerShell):
Bash: git log --oneline --since="4 weeks ago" 2>/dev/null || git log --oneline -20
Adjust the --since date to match the sprint duration if known from the sprint plan.
Scan for completed and incomplete tasks by comparing the plan against actual deliverables. Check for:
Scan the codebase for TODO/FIXME trends:
Read previous retrospectives (if any) from production/retrospectives/ to check:
## Retrospective: [Sprint N / Milestone Name]
Period: [Start Date] -- [End Date]
Generated: [Date]
### Metrics
| Metric | Planned | Actual | Delta |
|--------|---------|--------|-------|
| Tasks | [X] | [Y] | [+/- Z] |
| Completion Rate | -- | [Z%] | -- |
| Story Points / Effort Days | [X] | [Y] | [+/- Z] |
| Bugs Found | -- | [N] | -- |
| Bugs Fixed | -- | [N] | -- |
| Unplanned Tasks Added | -- | [N] | -- |
| Commits | -- | [N] | -- |
### Velocity Trend
| Sprint | Planned | Completed | Rate |
|--------|---------|-----------|------|
| [N-2] | [X] | [Y] | [Z%] |
| [N-1] | [X] | [Y] | [Z%] |
| [N] (current) | [X] | [Y] | [Z%] |
**Trend**: [Increasing / Stable / Decreasing]
[One sentence explaining the trend]
### What Went Well
- [Observation backed by specific data or examples]
- [Another positive observation]
- [Recognize specific contributions or decisions that paid off]
### What Went Poorly
- [Specific issue with measurable impact -- e.g., "Feature X took 5 days
instead of estimated 2, blocking tasks Y and Z"]
- [Another issue with impact]
- [Do not assign blame -- focus on systemic causes]
### Blockers Encountered
| Blocker | Duration | Resolution | Prevention |
|---------|----------|------------|------------|
| [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] |
### Estimation Accuracy
| Task | Estimated | Actual | Variance | Likely Cause |
|------|-----------|--------|----------|--------------|
| [Most overestimated task] | [X] | [Y] | [+Z] | [Why] |
| [Most underestimated task] | [X] | [Y] | [-Z] | [Why] |
**Overall estimation accuracy**: [X%] of tasks within +/- 20% of estimate
[Analysis: Are we consistently over- or under-estimating? For which types of
tasks? What adjustment should we apply?]
### Carryover Analysis
| Task | Original Sprint | Times Carried | Reason | Action |
|------|----------------|---------------|--------|--------|
| [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] |
### Technical Debt Status
- Current TODO count: [N] (previous: [N])
- Current FIXME count: [N] (previous: [N])
- Current HACK count: [N] (previous: [N])
- Trend: [Growing / Stable / Shrinking]
- [Note any areas of concern]
### Previous Action Items Follow-Up
| Action Item (from Sprint N-1) | Status | Notes |
|-------------------------------|--------|-------|
| [Previous action] | [Done / In Progress / Not Started] | [Context] |
### Action Items for Next Iteration
| # | Action | Owner | Priority | Deadline |
|---|--------|-------|----------|----------|
| 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] |
| 2 | [Another action] | [Who] | [Priority] | [When] |
### Process Improvements
- [Specific change to how we work, with expected benefit]
- [Another improvement -- keep it to 2-3 actionable items, not a wish list]
### Summary
[2-3 sentence overall assessment: Was this a good sprint/milestone? What is
the single most important thing to change going forward?]
Present the retrospective and top findings to the user (completion rate, velocity trend, top blocker, most important action item).
Ask: "May I write this to production/retrospectives/retro-sprint-[N]-[date].md?" (or production/retrospectives/retro-[milestone-name]-[date].md for milestone retrospectives)
If yes, write the file, creating the production/retrospectives/ directory if needed. Verdict: COMPLETE — retrospective saved.
If no, stop here. Verdict: BLOCKED — user declined write.
Use AskUserQuestion:
[A] Yes — open sprint planning with retro action items and velocity delta pre-populated[B] No — I'll reference the retrospective file manually when I'm readyIf the user selects [A]: Proceed to invoke /sprint-plan new, passing the retrospective file path and a summary of the action items and velocity change so the sprint planner can reference them.
/gate-check to formally assess readiness for the next phase.