/cs:iso27001-audit-prep <scope> — ISO 27001 ISMS audit readiness 6-question forcing interrogation. Use before annual Clause 9.2 internal audit, surveillance aud
复制下面这句话,粘贴给 Claude Code、Codex、Cursor 等 AI 编程工具,它会读取安装说明并在你确认后完成安装。
请阅读 https://ai.atlankj.com/install/asset/gh-iso27001-audit-prep-488f125c0dea ,按照其中的说明把「iso27001-audit-prep」安装到你(当前 AI 工具)中。执行前先告诉我将运行的命令和写入的位置,等我确认。
查看 AI 将读取的安装说明正在读取 GitHub 原文…
内容来自 GitHub 原始文件,由原作者维护。在 GitHub 查看
Command: /cs:iso27001-audit-prep <scope>
The ISO 27001 ISMS auditor pressure-tests any ISMS work. Six sample-driven questions before any internal audit, stage 1 readiness, or surveillance audit.
No 3-year coverage discipline, no defensible programme.
isms_audit_scheduler.py in ra-qm-team/skills/isms-audit-expert/Stale risk register = certification finding.
iso27001_audit_playbook.md for stage 1 expectationsMost-cited finding area.
Second-most-cited finding area.
A.5.24-27 + A.6.8 — high-stakes audit area.
Clause 9.3 required inputs are prescriptive — easy to miss.
multi_framework_audit_playbook.md) preferred to separate reviews# 1. Audit programme planning
python ra-qm-team/skills/isms-audit-expert/scripts/isms_audit_scheduler.py audit_scope.json
# 2. Mock audit for readiness check
python ../../skills/compliance-os/scripts/audit_simulator.py iso27001_scope.json
# 3. Cross-framework reuse (SOC 2 = 75% overlap; ISO 42001 = 60% reuse)
python ../../skills/compliance-os/scripts/cross_framework_mapper.py program.json
# ISO 27001 Audit Prep: <scope>
**Date:** YYYY-MM-DD
## The Decision Being Made
[programme-plan | finding-severity | cert-readiness | incident-followup]
## Audit Programme Status
- Clauses scheduled this year: <list>
- Annex A controls scheduled: <count>
- Rolling 3-year coverage: clean | gaps in <list>
- Auditor independence: clean | issues in <list>
## Risk Register Health
- Last refresh: YYYY-MM-DD
- High/critical risks without Annex A control link: N
- Residual risk acceptance documentation: complete | gaps
## High-Stakes Controls Status
- A.5.15 + A.8.2 + A.8.3 access control: pass/fail with sample
- A.5.19-A.5.21 supplier mgmt: pass/fail with sample
- A.5.24-27 + A.6.8 incident response: pass/fail with sample
- A.8.15-16 logging: pass/fail with sample
## Management Review Status
- Last review date: YYYY-MM-DD
- Required Article 9.3 inputs present: yes/no
- Open action items past due: N
## Cross-Framework Impact
- SOC 2 controls affected: <list>
- ISO 42001 controls affected (if applicable): <list>
- GDPR Article 32 controls affected: <list>
## Verdict
🟢 READY | 🟡 CLOSE-CRITICALS-FIRST | 🔴 NOT-READY
## Top 3 Actions
[3 concrete next steps with owner + corrective-action timeline]
/cs:compliance-readiness — for multi-framework view/cs:soc2-audit-prep — for SOC 2 cross-walk pair (75% overlap)/cs:aims-audit — for ISO 42001 AIMS cross-walk/cs:gdpr-audit-prep — for Article 32 organizational measures overlap/cs:ciso-review — for executive cybersecurity strategy/cs:decide — to log the verdictcs-ciso-iso27001isms-audit-expert../soc2-audit-prep/, ../aims-audit/, ../gdpr-audit-prep/, ../compliance-readiness/Version: 1.0.0