Discovers all projects in a .NET solution, classifies each for Oracle-to-PostgreSQL migration eligibility, and produces a persistent master migration plan. Use
复制下面这句话,粘贴给 Claude Code、Codex、Cursor 等 AI 编程工具,它会读取安装说明并在你确认后完成安装。
请阅读 https://ai.atlankj.com/install/asset/gh-creating-oracle-to-postgres-master-migration-plan-4e2ea6ad04b0 ,按照其中的说明把「creating-oracle-to-postgres-master-migration-plan」安装到你(当前 AI 工具)中。执行前先告诉我将运行的命令和写入的位置,等我确认。
查看 AI 将读取的安装说明正在读取 GitHub 原文…
内容来自 GitHub 原始文件,由原作者维护。在 GitHub 查看
Analyze a .NET solution, classify every project for Oracle→PostgreSQL migration eligibility, and write a structured plan that downstream agents and skills can parse.
Progress:
- [ ] Step 1: Discover projects in the solution
- [ ] Step 2: Classify each project
- [ ] Step 3: Confirm with user
- [ ] Step 4: Write the plan file
Step 1: Discover projects
Find the Solution File (it has a .sln or .slnx extension) in the workspace root (ask the user if multiple exist). Parse it to extract all .csproj project references. For each project, note the name, path, and type (class library, web API, console, test, etc.).
Step 2: Classify each project
Scan every non-test project for Oracle indicators:
Oracle.ManagedDataAccess, Oracle.EntityFrameworkCore (check .csproj and packages.config)appsettings.json, web.config, app.configOracleConnection, OracleCommand, OracleDataReader.github/oracle-to-postgres-migration/DDL/Oracle/ (if present)Assign one classification per project:
| Classification | Meaning |
|---|---|
| MIGRATE | Has Oracle interactions requiring conversion |
| SKIP | No Oracle indicators (UI-only, shared utility, etc.) |
| ALREADY_MIGRATED | A -postgres or .Postgres duplicate exists and appears processed |
| TEST_PROJECT | Test project; handled by the testing workflow |
Step 3: Confirm with user
Present the classified list. Let the user adjust classifications or migration ordering before finalizing.
Step 4: Write the plan file
Save to: .github/oracle-to-postgres-migration/Reports/MasterMigrationPlan.md
Use this exact template — downstream consumers depend on the structure:
# Master Migration Plan
**Solution:** {solution file name}
**Solution Root:** {REPOSITORY_ROOT}
**Created:** {timestamp}
**Last Updated:** {timestamp}
## DDL Artifacts
**Location:** {path to DDL artifacts, e.g., `.github/oracle-to-postgres-migration/DDL/`}
**External tool used:** {Yes / No} — {If Yes, name the tool (e.g., `ora2pg`) and note that Phase 4 (Schema & DDL Migration) can be skipped; PostgreSQL DDL artifacts already exist.}
## Solution Summary
| Metric | Count |
|--------|-------|
| Total projects in solution | {n} |
| Projects requiring migration | {n} |
| Projects already migrated | {n} |
| Projects skipped (no Oracle usage) | {n} |
| Test projects (handled separately) | {n} |
## Project Inventory
| # | Project Name | Path | Classification | Notes |
|---|---|---|---|---|
| 1 | {name} | {relative path} | MIGRATE | {notes} |
| 2 | {name} | {relative path} | SKIP | No Oracle dependencies |
## Migration Order
1. **{ProjectName}** — {rationale, e.g., "Core data access library; other projects depend on it."}
2. **{ProjectName}** — {rationale}
Order projects so that shared/foundational libraries are migrated before their dependents.